Development Activity
Certificates of Occupancy
These documents are issued by the City of Marble Falls certifying the building's compliance with building codes and indicating it is suitable for occupancy.
View last three (3) months of issued Certificates of Occupancy.
For additional information regarding commercial projects email the Permit Technician, or call 830-798-7086.
Marble Falls Mission Center
Estimated Completion Date: Spring 2023
Address: 408 Avenue R, Marble Falls, Texas 78654
Summary: 8,207 square foot building to provide community amenities and support such as food pantry, counseling, disaster relief, office area, and other ministries; will also have a chapel area.
Estimated Construction Value: $750,000
Baylor Scott & White Marble Falls Clinic
Estimated Completion Date: Spring 2023
Address: 706 Avenue G, Marble Falls, Texas 78654
Summary: Remodel of the 7,493 square foot Baylor Scott & White Marble Falls Clinic. Renovations being done to the first and second floors of the clinic.
Estimated Construction Value: $800,000
Sports Complex at Thunder Rock
Estimated Completion Date: Fall 2023
Address: 1000 Flatrock Blvd., Marble Falls, Texas 78654
Summary: Construction of a sports complex for the City of Marble Falls to provide four (4) baseball fields, four (4) soccer fields, a multipurpose field, two (2) concession buildings, and restrooms; and sidewalks will be constructed on the perimeter and within the complex to provide connectivity
Estimated Construction Value: $3,000,000
Pizza Hut
Estimated Completion Date: Fall 2023
Address: 1000 N US 281, Marble Falls, Texas 78654
Summary: Construction of a 3,840 square foot single story multi-tenant building. This building will house Pizza Hut and an additional tenant.
Estimated Construction Value: $510,000
CEFCO
Estimated Completion Date: Fall 2023
Address: 4303 N US 281, Marble Falls, Texas 78654
Summary: Construction of a new 159,773 square foot CEFCO convenience store and gas station with a semi-truck diesel only fueling station.
Estimated Construction Value: $3,500,000
HTeaO
Estimated Completion Date: Fall 2023
Address: 909 Avenue H, Marble Falls, Texas 78654
Summary: New construction of a 2,371 square foot HTeaO restaurant. Construction consists of parking, a drive-through and sidewalks that will be constructed around the perimeter.
Estimated Construction Value: $1,700,000
Flatz 281 Apartments
Estimated Completion Date: Spring 2024
Address: 6025 S US 281, Marble Falls, Texas 78654
Summary: Construction of a multi-family development consisting of 6 buildings, clubhouse, and pool. Total of 264 units, consisting of studio and 1, 2, & 3 bedroom apartments.
Estimated Construction Value: $31,500,000
ParcHAUS
Estimated Completion Date: Summer 2024
Address: 1601 Mustang Drive, Marble Falls, Texas 78654
Summary: Construction of a residential community consisting of 191 units, clubhouse, pool, and pickleball court.
Estimated Construction Value: $31,500,000
Roper West
Estimated Completion Date: Spring 2023
Address: 1840 S US 281
Summary: Public improvements related to Phase I of the Roper West Planned Development District including the extension of FM 2147 to the west to be known as Ridge Rock Road, an extension of water and wastewater utility lines, and the construction of a detention pond to serve the development and surrounding future developments
Estimated Construction Value: $3,200,000
Gregg Ranch Phase 2
Estimated Completion Date: Summer 2023
Address: Gregg Ranch Blvd., Marble Falls, Texas 78654
Summary: 36 acres; 126 total lots: 121 residential, 3 landscaping, 1 HOA, and 1 recreation; 4,376 linear feet of new public right-of-way; a sidewalk will be constructed along the west-side of West Cora Lee Loop and a gravel hike and bike trail will be constructed along the east-side of West Cora Lee Loop; sidewalks to be constructed along all other local streets; and the extension of 8-inch water and wastewater lines. Access to Phase 2 will be through Gregg Ranch Boulevard to West Cora Lee Loop; Gregg Ranch Boulevard connection to US 281 was constructed in Phase 1; West Cora Lee Loop connection to US 281 will be constructed in a future phase.
Estimated Construction Value: $4,000,000
Thunder Rock Phase 2A
Estimated Completion Date: Fall/Winter 2024
Address: Northwest corner of US 281 and SH 71, Marble Falls, Texas 78654
Summary: 119 acres; 225 total lots: 218 residential, 5 open space, and 2 non-residential lots; 9,940 linear feet of new public right-of-way; sidewalks to be constructed along all streets; and the extension of 8-inch water and wastewater lines. Access to the subdivision will be through two major thoroughfares: Thunder Rock Boulevard which connects to US 281, and Centurion Parkway which will connect to Flatrock Boulevard with access to State Highway 71.
Estimated Construction Value: $12,000,000
Capital improvement projects are public projects constructed by the city and funded with bond(s), tax, and/or utility fund revenues. These projects are to benefit the community and are publicly bid and awarded in accordance with State Law and local ordinance.
For additional information regarding capital improvement projects email the City Engineer, or call (830) 262-0232.
Tri-Campus Sidewalk Connectivity (CIPTR-20220607)
Project Scope: This project will improve safety for students and residents, increase connectivity, and provide alternatives to driving. This alignment accomplishes all of Project No 2, and part of Project No 7 and No. 10 from the Sidewalk Master Plan. The Tri-Campus connectivity project was submitted to TxDOT Safe Routes to School program. The project includes 6-foot sidewalks on 1 side of portions of Ave U, Broadway, Ave Q, Northwood Dr, and Terrace Dr, providing connectivity to MF Elementary, Middle School, Falls Career HS, HEB, the Boys & Girls Club, and City's parks.
Project Status: Engineering Design 100%
Budget: $1.9M
Engineer: Aguirre & Fields Engineering Innovators
Contractor: Nelson Lewis
Avenue Q Reconstruction (CIPTR-20210817)
Project Scope: Reconstruct 750' of Avenue Q from 1431 to Broadway. Pavement to be asphalt, 31' wide City standard, with curbs and 5' sidewalks on the west side of the street. The project will also include storm inlets and an underground storm system. The project also consists of extending the existing 12" water line to create a looped system.
Project Status: Under Construction - Estimated Completion October 2023
Budget: $1.5M
Engineer: Willis Environmental Engineering Inc.
Contractor: Black Rock Industries
Avenue N Bridge Upgrade (CIPTR-20210302)
Project Scope: This crossing was damaged during the October 2018 flood. The existing structure has a level of service less than a 2-year storm event. This is the primary entrance to Meadowlakes and Pecan Valley, and those areas were isolated during the October 2018 flood event. This project has grant funding from both the HMGP and TWDB PIP programs. The project will also be in partnership with Meadowlakes. Upgrade the existing low water crossing on Ave N at Backbone Creek. The current level of service of this structure is less than a 2-year storm. The proposed, upgrade install a bridge that would provide a 50-year level of service. This upgrade would likely include re-routing the existing hike & bike trail and disconnecting Backbone St at Ave N to create a turnaround area.
Project Status: Engineering Design 100% - Under FEMA review
Budget: $3.5M
Engineer: TRC Companies Inc.
Contractor:
Nature Heights Dr. Extension (CIPTR-20220118)
Project Scope: This project consists of constructing approx. 3,600 feet of roadway. The new roadway will have the typical city street cross-section, with sidewalks, street lighting, utility extensions, and necessary drainage improvements along the extension.
Project Status: Engineering Design 90%
Budget: $6.8M
Engineer: Aguirre & Fields Engineering Innovators
Contractor:
Nature Heights Dr. Low Water Crossing (Bridge) (CIPTR-20210615)
Project Scope: This is one of the most frequently closed low-water crossings within City limits. During a 2-year storm event, this crossing is projected to have over 4 feet of water over it, per the effective FEMA models. This project has grant funding from the HMGP program. This project consists of upgrading the low water crossing at Whitman Branch and Nature Heights Drive.
Project Status: Engineering Design 100% - Under FEMA review
Budget: $2.1M
Engineer: TRC Companies Inc.
Contractor:
Pecan Valley Sidewalk (CIPTR-20210817)
Project Scope: This project will improve safety for students and residents, increase connectivity, and provide alternatives to driving. This alignment accomplishes all of Project No 1 from the Sidewalk Master Plan. Install sidewalks on 1 side of Pecan Valley Drive to provide safe pedestrian options for residents and connect to existing infrastructure. The project would include enclosing an existing stormwater ditch and placing a sidewalk on top of it.
Project Status: Engineering Design 45%
Budget: $1M
Engineer: Aguirre & Fields Engineering Innovators
Contractor:
Raw Water Intake Repairs, Floodproofing and Upgrade (CIPTR-20210817)
Project Scope: This site was damaged during the Oct 2018 flood. This project is to repair and floodproof the existing raw water pump station. The building is a repetitive loss structure and this project will reduce risk to the City and prevent the raw water pump station from failure. The entire facility is located in the floodplain and is subject to future flood events. This project will build a new building (including electrical), new 12' diameter wet well, upgrade generator, extend pump shafts to raise motors, relocate all electrical components, and install manhole on raw water line for zebra mussel dosing. All components will be raised above the floodplain.
Project Status: Engineering Design 100%
Budget: $4.4M
Engineer: Miller Gray
Contractor: Associated Construction Partners